Receive notifications about remodeling updates
send an e-mail

Remodeling
home page

Ohio Avenue
home page

Photo policy

Updated Jan. 3, 2004
Posted June 18, 2003

misty morning

A peaceful morning -- before the demolition.

The house project at 133 Ohio

The demolition begins

June 12-16

wall studs

kitchen ceiling

Above: The kitchen ceiling joists. Note the 2 x 4.

Left: Where the kitchen sink used to be, looking into the former study.

kitchen wall with lath

ceiling joists

The study ceiling. How about those 2x4 joists on a 2-foot span? This means we can't use a flush beam, so a five-inch beam will come down from the ceiling. Now we know why the upstairs bathroom has that funky step.

knob-and-tube wiring

 

Left: Then there's that fun knob-and-tube wiring. Below: Nothing like a room that feels open.

studs, walls

wall with trap door

Some sort of coal chute or something? Behind this wall is the half bath.

toilet

By the end of the day Monday, only the toilet remained.

Siding, June 14-16 Excavation, June 17 Waiting for concrete, June 18-???