The house project @133 Ohio

During the weekend, Karen had the pleasure of removing siding from the back of the house, in preparation for the excavator. Fortunately, Stuart, who is experienced in this sort of project, came along at the right moment. We pulled siding for an hour or two, then went to the block party. Saturday, June 14-Monday, June 16.

man pulling siding

We made a good start on the siding before the block party on Saturday, June 14.

man at wall
cat looks at house

side of house

By Sunday, most of the siding was gone, in time for Karen to go to another party.

stairs to basement

rafters

Left: The refrigerator used to sit on the platform above the bottom of the stairs. Creative use of space.

man, woman talking

By the end of the day Monday, the lean-to over the basement stairs was gone. Kevin and Jen catch up.

man in pit

Shane emerges from the basement to say hello to Jen. He dug a pit and poured concrete for the footings for the new basement stairs.

Demolition
June 12-16
Siding
June 14-16
Excavation
June 17
Waiting for concrete
June 18-??
Inside
June 23-July 3
Outside
June 23-July 3
Ah, running water
June 23-July 3
 
Basement becomes accessible
July 3-10
   
Taking sides
July 14-22
Framing analysis
July 14-22
Lift high the roofbeam, carpenters
July 14-22
Phase 6: Windows, doors, decks, electricity, deck joists, drywall
Exploring the interior
July 22-Aug. 13
Shower is working
August
Plumbing the depths
July 22-Aug. 13
Dare to drywall
Aug. 14