Posted July 5, 2003

Sweet concrete

The concrete folks finally showed up and did their thing. Meanwhile, the inside of the house grew stronger and stronger. Read more

2 men, pickup truck
cement truck
man, cement chute
man shoveling

forms at the ready

Forms were delivered.
Notice the footings along the perimeter of the pit.

forms with drying concrete

The concrete workers set up the forms and poured the walls.

dirt, foundation

Once the foundation was dry and the forms removed, above, the waterproofers came. They also installed drain tile, right.

waterproofed foundation
cat in tree

man in street

James, above, watches as Tilly scurries high up into the maple tree, above left. We breathe easier once she crawls to a lower bough.

cat in bough
bobcat

dirt, foundation

The bobcat filled in around the foundation on Wednesday. The yard already looks nicer than the busted up weedy concrete that formed the driveway. Below, the concrete people should pour the apron for the new driveway on Wednesday … we shall see …
driveway-to-be
Demolition
June 12-16
Siding
June 14-16
Excavation
June 17
Waiting for concrete
June 18-??
Inside
June 23-July 3
Outside
June 23-July 3
Ah, running water
June 23-July 3
 
Basement becomes accessible
July 3-10
   
Taking sides
July 14-22
Framing analysis
July 14-22
Lift high the roofbeam, carpenters
July 14-22
Phase 6: Windows, doors, decks, electricity, deck joists, drywall
Exploring the interior
July 22-Aug. 13
Shower is working
August
Plumbing the depths
July 22-Aug. 13
Dare to drywall
Aug. 14